What we did:
The project is a hospital built from 1977-1978, with a total area of 40000m2. Therefore, from the input data of drawings in PD format with old, blurred condition, Harmony AT created as built structural models on Revit with the aim of serving as a basis for design, renovation, and new construction.
This is a type of prefabricated construction using prefabricated concrete components combined with freshly poured on-site concrete. HAT completed the project within 5 months, achieving maximum customer satisfaction.
The old drawing
Revit structural models